Decarbonizing Industrial Heat: Electrification, Thermal Storage and Hydrogen by Temperature Band

Industrial heat accounts for roughly one-fifth of global emissions and is hard to abate. This report compares the cost and readiness of electrification, thermal storage and hydrogen across temperature bands.

|12 min read|Dr. Henrik Johansson

Abstract

Industrial process heat represents about 20% of global energy-related CO2 emissions, or roughly 7.4 gigatonnes annually, and around 74% of it is produced from fossil fuels. Unlike power generation, no single technology can displace fossil heat across all uses: the right solution depends on temperature, process continuity and local energy prices.

Our analysis of 62 industrial heat applications shows that electrification is already cost-competitive for temperatures below 200 degrees Celsius where industrial heat pumps achieve coefficients of performance of 3.0 to 4.5. Between 200 and 500 degrees, thermal storage and resistive or electrode boilers can compete where electricity prices are below $55 per megawatt-hour. Above 1,000 degrees, hydrogen and other options remain 40% to 120% more expensive than natural gas without policy support.

We map costs by temperature band, assess deployment barriers, and set out priorities for industrial operators and policymakers.

Key Findings

  • 1Industrial heat represents about 20% of global energy-related CO2 emissions; about 46% of demand is below 400 degrees Celsius and technically addressable with current electrification options
  • 2Heat pumps deliver heat below 160 degrees at levelised costs of $28 to $48 per megawatt-hour thermal, competitive with natural gas at prices above $9 per MMBtu
  • 3Thermal storage paired with variable renewables can lower the effective cost of 200 to 500 degree heat by 18% to 30% compared with grid-only electric boilers
  • 4Hydrogen-based heat above 1,000 degrees costs $95 to $160 per megawatt-hour thermal against $38 to $55 for natural gas, requiring carbon prices above $190 per tonne to reach parity

Introduction

Industrial heat is used to produce steam, dry materials, drive chemical reactions and melt metals. Demand is distributed across temperature bands: about 46% below 400 degrees Celsius, 14% between 400 and 1,000 degrees, and 40% above 1,000 degrees, the last largely in cement, steel, glass and ceramics. Natural gas, coal and oil supply nearly three quarters of this energy.

Policy attention has focused on power and transport, but industrial heat has become a priority as carbon pricing and corporate commitments tighten. In the European Union, the carbon price has averaged approximately $82 per tonne in 2026 and free allocation is being phased out, while incentives in North America favour electrification and hydrogen production. Operators face capital decisions with asset lives of 25 to 40 years.

This report addresses:

  • What technologies are available in each temperature band and at what cost
  • How storage and flexibility change the economics of electrified heat
  • What conditions are needed for hydrogen and other options to compete at high temperatures

Research Methodology

We built a levelised cost model by temperature band and tested it against project data and operator interviews.

Cost Model. We estimated levelised cost of heat for 62 representative applications across 11 industries and 9 regions, including capital, energy, operating and carbon costs, using 2026 prices and a 8% cost of capital.

Project Review. We analysed 140 operating and announced industrial decarbonisation projects, reviewing capital intensity, performance and reported timelines.

Expert Interviews. We conducted 33 interviews with plant managers, technology suppliers, utilities and energy policy specialists.

Low and Medium Temperatures: Heat Pumps and Electric Boilers

Below 160 degrees Celsius, which covers food processing, paper drying, textiles and parts of chemicals, industrial heat pumps are the most efficient solution. Commercial units now deliver coefficients of performance of 3.0 to 4.5 depending on temperature lift, and levelised costs of $28 to $48 per megawatt-hour thermal. This is competitive with gas boilers where gas costs more than $9 per MMBtu, or where carbon costs exceed about $45 per tonne.

Between 160 and 400 degrees, options include high-temperature heat pumps, which are still scaling, and electric or electrode boilers. Electric boilers convert electricity to heat at close to 99% efficiency, but their cost depends directly on power prices. At electricity prices of $55 per megawatt-hour or less, they compete with gas at carbon prices of about $100 per tonne, but at $90 per megawatt-hour the required carbon price rises above $180.

  • Heat pumps. Capital cost $350 to $700 per kilowatt thermal; payback 3 to 7 years in favourable markets.
  • Electrode boilers. Capital cost $80 to $160 per kilowatt thermal; well suited for steam at 180 to 350 degrees.
  • Grid connection. Interconnection delays of 3 to 5 years in some regions are the main non-cost barrier.
  • Waste heat. Integration with existing sources can raise heat pump efficiency by 20% to 40%.

Levelised Cost of Heat by Technology ($ per MWh thermal, midpoint)

Natural gas boiler
46
Industrial heat pump
38
Electrode boiler
62
Hydrogen furnace
128

Thermal Storage and Flexibility

Thermal storage addresses the intermittency of low-cost renewable electricity. Systems using molten salt, crushed rock, ceramic bricks or graphite can store heat at 200 to 1,500 degrees, charging when power is cheap and discharging to meet continuous process demand. Capital costs for sensible storage range from $15 to $40 per kilowatt-hour thermal at industrial scale, notably lower than electrical battery storage.

In our model, pairing storage with variable renewable supply lowers the effective cost of 200 to 500 degree heat by 18% to 30% compared with grid-only electric boilers, in markets with significant daily price variation. In regions with high solar penetration, a 12-hour storage system can capture about 70% of the lowest-price hours. Projects in Northern Europe and Australia are demonstrating annual capacity factors of 85% with firm output.

Storage also provides grid benefits. Industrial flexibility can reduce peak demand and defer network investment, and several markets now pay for demand response from electrified heat. Operators able to monetise flexibility earned an additional $4 to $11 per megawatt-hour thermal in pilot programmes, which improves project returns.

Key Decarbonization Metrics

46%Share of industrial heat demand below 400 degrees
24%Cost reduction from pairing thermal storage with renewables (midpoint)
190+Carbon price for hydrogen heat parity ($ per tonne)
20%Industrial heat share of energy CO2 emissions

High Temperatures: Hydrogen and Alternative Pathways

Above 1,000 degrees Celsius, as in cement kilns, glass furnaces and steel reheating, the options narrow. Hydrogen combustion can retrofit some furnaces but with modifications to burners, flame characteristics and emissions controls. At current electrolytic hydrogen production costs of $4.50 to $7.00 per kilogram, delivered heat costs $95 to $160 per megawatt-hour thermal, compared with $38 to $55 for natural gas. Reaching parity would require carbon prices above $190 per tonne or hydrogen at roughly $2.00 per kilogram.

Alternatives are advancing. Direct electric heating, including plasma and induction systems, can reach very high temperatures with high efficiency in specific processes, such as glass melting and metals. Biomass and biogas supply limited volumes, and carbon capture is relevant where process emissions cannot be avoided, as in cement. Capture costs of $60 to $110 per tonne of CO2 make it viable under strong carbon pricing.

Technology readiness varies. Electric glass furnaces and hybrid designs have reached commercial demonstration, and hydrogen-ready steel facilities are under construction. Nonetheless, investment decisions depend on policy certainty, as asset owners are reluctant to commit capital that depends on uncertain hydrogen supply or subsidy continuity.

Conclusions & Outlook

The path to decarbonised industrial heat is differentiated by temperature. Electrification is ready for the largest portion of demand, representing around 46% of heat requirements, and economics are favourable where electricity prices and carbon costs are aligned. Storage broadens the range of viable applications and improves returns. High-temperature heat remains the most challenging segment and depends on policy support.

Over the next five years, we expect:

  • Heat pump installations in European and North American industry to triple, driven by process heat below 160 degrees
  • Thermal storage deployments to exceed 40 gigawatt-hours thermal globally by 2030
  • Hydrogen use in heat to remain below 3% of industrial energy, concentrated in locations with low-cost supply and steel or chemical clusters

Industrial operators should prioritise low-regret electrification, secure grid connections early, and evaluate storage for flexible operation. Policymakers can accelerate progress by reducing interconnection delays, stabilising carbon price signals, and supporting first-of-a-kind high-temperature projects.

Methodology

This report uses a levelised cost of heat model covering 62 representative industrial applications across 11 industries and nine regions, with costs expressed in 2026 US dollars at an 8% cost of capital. Model inputs were validated against 140 operating and announced industrial decarbonisation projects and 33 interviews with plant managers, technology suppliers, utilities and policy specialists. Temperature band shares are derived from published energy statistics and industry surveys, and carry an uncertainty of plus or minus 5 percentage points. Forward projections are Metaclade Research estimates and are sensitive to power prices, hydrogen costs and policy developments.